Completing an Accident Report |
|
Based on written information and vebal accounts of an accident, complete an Accident Report. Three different scenarios are given within this task.
|
Emploi, Formation en apprentissage |
CompletingAnAccidentReport_EA_A1.3_B2.2_B3.3a_C2.1_practitionercopy.docx |
FILLABLECompletingAnAccidentReport_EA_A1.3_B2.2_B3.3a_C2.1_practitionercopy.pdf |
2 Mars 2013 |
Create a Scale Drawing for a Shed |
|
Create a scale drawing using measurements for correct placement of material for a garden shed.
|
Emploi, Formation en apprentissage, Autonomie |
READYCreateAScaleDrawingForAShed_EAI_C3.3_practitionercopy.docx |
READYCreateAScaleDrawingForAShed_EAI_C3.3_practitionercopy.pdf |
21 Mai 2015 |
Create a Scale Drawing for Landscaping |
|
Create a scale drawing for a front yard for a landscaping project.
|
Emploi, Formation en apprentissage, Autonomie |
READYCreateAScaleDrawingForLandscaping_EAI_C3.3_practitionercopy.docx |
READYCreateAScaleDrawingForLandscaping_EAI_C3.3_practitionercopy.pdf |
12 Mai 2015 |
Creating & Calculating a Restaurant Bill |
|
Complete the restaurant bill for several tables of guests.
|
Emploi, Études postsecondaires |
READYCreatingandCalculatingaRestaurantBill_EP_A2.3_B3.2a_B3.3b_C1.2_D.3_practitionercopy.docx |
READYCreatingandCalculatingaRestaurantBill_EP_A2.3_B3.2a_B3.3b_C1.2_D.3_practitionercopy.pdf |
17 Juillet 2013 |
Doubling a Tomato Soup Recipe |
|
Calculate amounts needed when doubling a recipe and convert between different units of measurement.
|
Emploi, Formation en apprentissage, Études postsecondaires, Études secondaires, Autonomie |
READYDoublingTomatoSoup_EASPI_C3.3_practitionercopy.docx |
FILLABLEDoublingTomatoSoup_EASPI_C3.3_practitionercopy.pdf |
20 Février 2015 |
Dues Schedule |
|
Calculate the cost of dues for various members with different membership rates at a country club.
|
Emploi |
READYDuesSchedule_E_A2.2_C1.3_C4.2_practitionercopy.docx |
FILLABLEDuesSchedule_E_A2.2_C1.3_C4.2_practitionercopy.pdf |
3 Mars 2013 |
Finding and Calculating Working Load Limits |
|
Understanding how to calculate Working Load Limits for rope, using formulas. Using the internet to locate information related to rope strength.
|
Formation en apprentissage, Études secondaires |
FindingandCalculatingWorkingLoadLimitsforMillwrights_AS_A2.2_B2.1_C3.3_D.2.docx |
FindingandCalculatingWorkingLoadLimitsforMillwrights_AS_A2.2_B2.1_C3.3_D.2.pdf |
2 Avril 2014 |
Formulas in Plumbing |
|
The learner will use formulas to calculate pipe ratios and determining water pressure in water tanks.
|
Formation en apprentissage |
READYFormulasInPlumbing_A_A1.2_C3.3_practitionercopy.docx |
FILLABLEFormulasInPlumbing_A_A1.2_C3.3_practitionercopy.pdf |
11 Avril 2014 |
Identify and Schedule Activities |
|
The learner will review a recreation timetable then identify and schedule activities.
|
Autonomie |
READYIdentifyAndScheduleActivities_I_C2.3_practitionercopy.docx |
FILLABLEIdentifyAndScheduleActivities_I_C2.3_practitionercopy.pdf |
8 Mai 2015 |
Interpret and Create Drawings |
|
Use a Legend to interpret electrical features on a blueprint, and to determine materials needed for a job.
|
Emploi, Formation en apprentissage |
Interpret and Create Drawings_EA_A2.3_B3.2a_C4.1_practitionercopy.docx |
Interpret and Create Drawings_EA_A2.3_B3.2a_C4.1_practitionercopy.pdf |
20 Février 2025 |